Shute Road Multi-Use Path

Share Shute Road Multi-Use Path on Facebook Share Shute Road Multi-Use Path on Twitter Share Shute Road Multi-Use Path on Linkedin Email Shute Road Multi-Use Path link

Past Open House
June 17, 2024 @ Brookwood Library

If you missed the recent open house, you can always chat with project staff about the planned improvements and ask questions using the comment section at the bottom of this page.


Shute Road is an important connector street in Hillsboro. However, it is currently lacking bicycle facilities from the Dawson Creek crossing to Cornell Road. The City of Hillsboro plans to improve Shute Road between Brookwood Parkway and Cornell Road.

The proposed improvements will include the following features:

  • Retaining the existing sidewalk along the east side of Shute Road
  • Constructing a new 12’ wide multi-use path along the west side of Shute Road
  • New streetlights along the multi-use path to meet current standards
  • Updated storm water improvements to provide better conveyance and water quality treatment for existing untreated areas.
  • Removal and replacement of select street trees

These improvements will create a complete link for pedestrian and cyclist use along Shute Road from Cornell to Brookwood.


What is a Multi-Use-Path (MUP)?

A Multi-Use Path (MUP) or Shared Use Path is an off-road infrastructure that physically separates motorized vehicles from other modes of transportation such as bicycles. The versatility of the Shute Road MUP will serve as a safe and functional space for all community members to travel by various means. These paths are designed to accommodate two-way, non-vehicular traffic and can accommodate pedestrians and cyclists alike.


How will the Shute Road Multi-Use-Path increase safety for commuters?

The City of Hillsboro strives to create solutions where residents can access safe and comfortable transportation options. The Shute Road MUP helps further that initiative by creating an alternative space for cyclists and pedestrians without the need to share space with large, motorized vehicles, reducing the number of crashes and potential accidents.

The design of the Shute Road MUP hinges on exceptional user experience and overall improvement of the space along the west side of Shute Road. While an individual’s use of this path may invariably overlap at times with other’s using the path, the expansive 10-12-foot-wide footprint allows for everyone to enjoy the path safely with limited congestion and a reduced risk of collision.

In addition to creating a more walkable and bikeable space, the construction of the path will narrow the overall width of Shute Road, reducing overall speeds and provide traffic calming on Shute Road.


Funding

The full project is estimated to cost approximately $6 million and will be funded completely by Intel as part of their recent expansion at Ronler Acres.


Traffic During Construction

Shute Road will remain open to two-way traffic during construction. Portions of the existing sidewalk and multi-use path will be closed while constructing the new multi-use path. Don’t worry there will always be one sidewalk open at all times!


Construction Update

Construction crews are making great progress!

Crews are continuing road excavation between Airport Road and Cornell Road. This phase of excavation is anticipated to be completed by the end of November. In addition to the road work, improvements to the storm sewer system is underway from Tandem Way to Airport Road.

Signal pole foundation work continues at the intersection of Shute Road and Dawson Creek Parkway.

There is no work scheduled on Shute Road during the week of Thanksgiving (11/25-11/28). Temporary traffic control measures will remain in place. Please be vigilant while traveling through the corridor as there is much activity and traffic patterns are ever changing.




Past Open House
June 17, 2024 @ Brookwood Library

If you missed the recent open house, you can always chat with project staff about the planned improvements and ask questions using the comment section at the bottom of this page.


Shute Road is an important connector street in Hillsboro. However, it is currently lacking bicycle facilities from the Dawson Creek crossing to Cornell Road. The City of Hillsboro plans to improve Shute Road between Brookwood Parkway and Cornell Road.

The proposed improvements will include the following features:

  • Retaining the existing sidewalk along the east side of Shute Road
  • Constructing a new 12’ wide multi-use path along the west side of Shute Road
  • New streetlights along the multi-use path to meet current standards
  • Updated storm water improvements to provide better conveyance and water quality treatment for existing untreated areas.
  • Removal and replacement of select street trees

These improvements will create a complete link for pedestrian and cyclist use along Shute Road from Cornell to Brookwood.


What is a Multi-Use-Path (MUP)?

A Multi-Use Path (MUP) or Shared Use Path is an off-road infrastructure that physically separates motorized vehicles from other modes of transportation such as bicycles. The versatility of the Shute Road MUP will serve as a safe and functional space for all community members to travel by various means. These paths are designed to accommodate two-way, non-vehicular traffic and can accommodate pedestrians and cyclists alike.


How will the Shute Road Multi-Use-Path increase safety for commuters?

The City of Hillsboro strives to create solutions where residents can access safe and comfortable transportation options. The Shute Road MUP helps further that initiative by creating an alternative space for cyclists and pedestrians without the need to share space with large, motorized vehicles, reducing the number of crashes and potential accidents.

The design of the Shute Road MUP hinges on exceptional user experience and overall improvement of the space along the west side of Shute Road. While an individual’s use of this path may invariably overlap at times with other’s using the path, the expansive 10-12-foot-wide footprint allows for everyone to enjoy the path safely with limited congestion and a reduced risk of collision.

In addition to creating a more walkable and bikeable space, the construction of the path will narrow the overall width of Shute Road, reducing overall speeds and provide traffic calming on Shute Road.


Funding

The full project is estimated to cost approximately $6 million and will be funded completely by Intel as part of their recent expansion at Ronler Acres.


Traffic During Construction

Shute Road will remain open to two-way traffic during construction. Portions of the existing sidewalk and multi-use path will be closed while constructing the new multi-use path. Don’t worry there will always be one sidewalk open at all times!


Construction Update

Construction crews are making great progress!

Crews are continuing road excavation between Airport Road and Cornell Road. This phase of excavation is anticipated to be completed by the end of November. In addition to the road work, improvements to the storm sewer system is underway from Tandem Way to Airport Road.

Signal pole foundation work continues at the intersection of Shute Road and Dawson Creek Parkway.

There is no work scheduled on Shute Road during the week of Thanksgiving (11/25-11/28). Temporary traffic control measures will remain in place. Please be vigilant while traveling through the corridor as there is much activity and traffic patterns are ever changing.




Project Questions or Concerns

Please reach out with any questions or concerns you may have.

loader image
Didn't receive confirmation?
Seems like you are already registered, please provide the password. Forgot your password? Create a new one now.
  • Share What is the estimated time of completion of the project? on Facebook Share What is the estimated time of completion of the project? on Twitter Share What is the estimated time of completion of the project? on Linkedin Email What is the estimated time of completion of the project? link

    What is the estimated time of completion of the project?

    Dave73 asked about 1 month ago

    The project is anticipated to be substantially complete in Summer, 2025 with minor land surveying to take place after construction. 

  • Share What is the estimated completion date? on Facebook Share What is the estimated completion date? on Twitter Share What is the estimated completion date? on Linkedin Email What is the estimated completion date? link

    What is the estimated completion date?

    m asked 2 months ago

    The project is anticipated to be completed sometime between December 2024 and January 2025. 

  • Share Why was it necessary to tear up the center of Shute Rd on Facebook Share Why was it necessary to tear up the center of Shute Rd on Twitter Share Why was it necessary to tear up the center of Shute Rd on Linkedin Email Why was it necessary to tear up the center of Shute Rd link

    Why was it necessary to tear up the center of Shute Rd

    woodtales asked 3 months ago

    The west curb line of Shute Road will be moved closer to the center of the road to make room for the Multi use path on the west side. To accommodate 2 travel lanes, the center median needed to be removed.  They are currently building the road section and will pave in the next couple weeks.